We’re a meter. We read data from every party in a coordinated capacity arrangement and keep one sealed record of what was delivered.
V-Meter doesn’t dispatch, trade, or own anything in a sleeve. We just measure.
Transmission upgrades take 5 to 7 years, and large loads can’t wait that long. A load can connect early on a flexible basis, but then it can be curtailed when the grid gets tight, and most large loads don’t want that risk. Batteries elsewhere on the grid can take it on by discharging where the congestion is. V-Meter provides the proof of action across time, space, and multiple parties.
Upgrades aren’t built yet, so the grid can curtail the load.
V-Meter reads consumption and price.Remote batteries reprice so they get dispatched ahead of the load.
V-Meter reads availability and price.Congestion eases and the load keeps running.
V-Meter reads Operator instructions and grid conditions.The Program Manager settles using one shared set of numbers.
V-Meter publishes delivered, committed, and entitled MW per interval.V-Wire pushes for rules that let sleeves exist. V-Meter has a smaller job: record what happened, the same way for every party.
The Program Manager structures the pool and runs settlement. The operator (QSE, etc.) runs dispatch in real time. V-Meter takes in data from each of them and gives everyone the same record back.
Every interval goes through the same four steps. The result is tamper-evident, meaning a change after the fact can be detected.
Each interval gets a fingerprint anchored to an outside timestamp.
We’re working with a few early partners on the first sleeves. You’d get preferred terms and a say in the API schema. It usually starts with an API review, then a replay of historical intervals, then a live pilot.
Get in touch